Mandatory Provision in ASHRAE 90.1_2010

Posted on 4月 22, 2017 in Guideline

  1. Building Envelope

    1. Insulation
      1. Labeling of Building Envelope Insulaiton
      2. Compliance with Manufacturers' Requirements
      3. Loose-Fill Insulation Limitation
      4. Baffles
      5. Substantial Contact
      6. Recessed Equipment
      7. Insulation Protection
      8. Location of Roof Insulaiton
      9. Extent of Insulaiton
    2. Fenestration and Doors
      1. Rating of Fenestration Products
      2. Labeling of Fenestration Products
      3. Labeling of Doors
      4. U-factor
      5. Solar Heat Gain Coefficient
      6. Visible Transmittance
    3. Air Leakage
      1. Continuous Air Barrier
        1. Air Barrier Design
        2. Air Barrier Installation
        3. Accenptable Materials and Assemblies
      2. Fenestration and Doors
      3. Loading Dock Weatherseals
      4. Vestibules
  2. Heating,Ventilating,and Air Conditioning

    1. Equipment Efficeincies,Verification,and Labeling Requirements
      1. Minimum Equipment Efficiencies-Listed Equipment-Standard Rating and Operating Conditions
        1. Air Conditioners and Condensing Units
        2. Heat Pumps
        3. Water-Chilling Packages
        4. Packaged Terminal and Room Air Conditioners and Heat Pumps
        5. Furnaces, Duct Furnaces, and Unit Heaters
        6. Boilers
        7. Heat Rejection Equipment
        8. Heat Transfer Equipment
        9. Variable Refrigerant Flow Air Conditioners
        10. Variable Refrigerant Flow Air-to-Air and Applied Heat Pumps
        11. Air Conditioners Serving Computer Rooms
      2. Minimum Equipment Efficiencies-Listed Equipment-Nonstandard Conditions
        1. Water-cooled centrifugal chilling packages
        2. Positive displacement(air- and water-cooled) chilling packages
      3. Equipment Not Listed
      4. Verification of Equipment Efficiencies <=here
      5. Labeling
        1. Mechanical Equipment
        2. Packaged Terminal Air Conditioners
    2. Caculations
      1. Load Calculations=>ASHRAE183 Peak Cooling and Heating Load Calculation in Buildings Except Low-Rise Residential Buildings
      2. Pump Head
    3. Controls
      1. Zone Thermostatic Controls
        1. General
        2. Dead Band
      2. Setpoint Overlap Restriction
      3. Off-Hour Controls
        1. Automatic Shutdown
        2. Setback Controls
        3. Optimum Start Controls
        4. Zone Isolation
      4. Ventilation System Controls
        1. Stair and Shaft Vents
        2. Shutoff Damper Controls
        3. Damper Leakage
        4. Ventilation Fan Controls
        5. Enclosed Parking Garage Ventilation
      5. Heat Pump Auxilary Heat Control
      6. Humidifier Preheat
      7. Humidification and Dehumidification
      8. Freeze Protection and Snow/Ice Melting System
      9. Ventilation Controls for High-Occupancy Areas
      10. Single Zone Variable-Air-Volume Controls
    4. HVAC System Construction and Insulation
      1. Insulation
        1. General
        2. Duct and Plenum Insulation
        3. Piping Insulation
        4. Sensible Heating Panel Insulation
        5. Radiant Floor Heating
      2. Ductwork and Plenum Leakage
        1. Duct Sealing
        2. Duct Leakage Tests
  3. Service Water Heating
    1. Load Calculations
    2. Equipment Efficiency
    3. Service Hot-Water Piping Insulation
    4. Service Water Heating System Controls
      1. Temperature Controls
      2. Temperature Maintenance Controls
      3. Outlet Temperature Controls
      4. Circulating Pump Controls
    5. Pools
      1. Pool Heaters
      2. Pool Covers
      3. Time Switches
    6. Heat Traps
  4. Power
    1. Voltage Drop
      1. Feeders
      2. Branch Circuits
    2. Automatic Receptacle Control
  5. Lighting
    1. Lighting Control
      1. Automatic Lighting Shutoff
      2. Space Control
      3. Parking Garage Lighting Control
      4. Automatic Daylighting Controls for Primary Sidelighted Areas
      5. Automatic Daylighting Controls for Toplighting
      6. Additional Control
      7. Exterior Lighting Control
    2. Exit Signs
    3. Exterior Building Lighting Power
    4. Functional Testing
  6. Other Equipment
    1. Electric Motors
    2. Service Water Presure Booster Systems
    3. Elevators
      1. Lighting
      2. Ventilation Power Limitation
      3. Standby Mode